How can I change the shape of the task bar
With Exg2antt1 With .Chart.Bars.Copy("Task","T2") .StartShape = exontrol.EXG2ANTTLib.ShapeCornerEnum.exShapeIconDown1 .StartColor = Color.FromArgb(255,0,0) End With .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add("Column") With .Items .AddBar(.AddItem("Item 1"),"T2",#1/2/2001#,#1/4/2001#) .AddBar(.AddItem("Item 2"),"Task",#1/2/2001#,#1/4/2001#) End With End With |
699 |
How can I change the starting shape for all task bars
With Exg2antt1 With .Chart.Bars.Item("Task") .StartShape = exontrol.EXG2ANTTLib.ShapeCornerEnum.exShapeIconUp1 .StartColor = Color.FromArgb(255,0,0) End With .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add("Column") With .Items .AddBar(.AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001#) End With End With |
698 |
How can I change the height of the task bar
With Exg2antt1 .Chart.Bars.Copy("Task","T2").Height = 17 .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add("Column") With .Items .AddBar(.AddItem("Item 1"),"T2",#1/2/2001#,#1/4/2001#) .AddBar(.AddItem("Item 2"),"Task",#1/2/2001#,#1/4/2001#) End With End With |
697 |
How can I change the height for all task bars
With Exg2antt1 .Chart.Bars.Item("Task").Height = 17 .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add("Column") With .Items .AddBar(.AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001#) End With End With |
696 |
How can I change the color of the task bar
With Exg2antt1 .Chart.Bars.Copy("Task","T2").Color = Color.FromArgb(255,0,0) .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add("Column") With .Items .AddBar(.AddItem("Item 1"),"T2",#1/2/2001#,#1/4/2001#) .AddBar(.AddItem("Item 2"),"Task",#1/2/2001#,#1/4/2001#) End With End With |
695 |
How can I change the color for all task bars
With Exg2antt1 .Chart.Bars.Item("Task").Color = Color.FromArgb(255,0,0) .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add("Column") With .Items .AddBar(.AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001#) End With End With |
694 |
How can I change the shape for all task bars
With Exg2antt1 .Chart.Bars.Item("Task").Shape = exontrol.EXG2ANTTLib.ShapeBarEnum.exShapeSolidDown .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add("Column") With .Items .AddBar(.AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001#) End With End With |
693 |
How can I change the shape of the task bar
With Exg2antt1 .Chart.Bars.Copy("Task","T2").Shape = exontrol.EXG2ANTTLib.ShapeBarEnum.exShapeThinCenter .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add("Column") With .Items .AddBar(.AddItem("Item 1"),"T2",#1/2/2001#,#1/4/2001#) End With End With |
692 |
How can I change the pattern or style for all task bars
With Exg2antt1 .Chart.Bars.Item("Task").Pattern = exontrol.EXG2ANTTLib.PatternEnum.exPatternFDiagonal .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add("Column") With .Items .AddBar(.AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001#) End With End With |
691 |
How can I change the pattern of the task bar
With Exg2antt1 .Chart.Bars.Copy("Task","T2").Pattern = exontrol.EXG2ANTTLib.PatternEnum.exPatternFDiagonal .Chart.FirstVisibleDate = #1/1/2001# .Columns.Add("Column") With .Items .AddBar(.AddItem("Item 1"),"T2",#1/2/2001#,#1/4/2001#) End With End With |
690 |
How can I add a percent bar in the chart area, so the task bar is splited for non working days or hours
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.Bars.Add("Task%Progress:Split").Shortcut = "TS" .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"TS",#1/2/2001#,#1/16/2001#,"P1") .set_ItemBar(h,"P1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.14) .set_ItemBar(h,"P1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarShowPercentCaption,True) End With End With |
689 |
How can I add a bar in the chart area, so the task bar is splited for non working days or hours
With Exg2antt1 .Columns.Add("Task") .Chart.Bars.Add("Task:Split").Shortcut = "TS" .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar(.AddItem("Task 1"),"TS",#1/2/2001#,#1/16/2001#) End With End With |
688 |
How can I add a split bar in the chart area
With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar(.AddItem("Task 1"),"Split",#1/2/2001#,#1/6/2001#) End With End With |
687 |
How can I add a progress bar in the chart area
With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar(.AddItem("Task 1"),"Progress",#1/2/2001#,#1/6/2001#) End With End With |
686 |
How can I add a milestone bar in the chart area
With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar(.AddItem("Task 1"),"Milestone",#1/2/2001#,#1/2/2001#) End With End With |
685 |
How can I add a summary bar in the chart area
With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar(.AddItem("Task 1"),"Summary",#1/2/2001#,#1/6/2001#) End With End With |
684 |
How can I add a project summary bar in the chart area
With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar(.AddItem("Task 1"),"Project Summary",#1/2/2001#,#1/6/2001#) End With End With |
683 |
How can I add a deadline bar in the chart area
With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar(.AddItem("Task 1"),"Deadline",#1/2/2001#,#1/2/2001#) End With End With |
682 |
How can I add a task bar in the chart area
With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar(.AddItem("Task 1"),"Task",#1/2/2001#,#1/4/2001#) End With End With |
681 |
How can I assign a picture or an icon to a bar in the chart
Dim h With Exg2antt1 .set_HTMLPicture("p1","c:\exontrol\images\zipdisk.gif") .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .set_ItemHeight(h,48) .AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCaption,"<img>p1</img>") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarHAlignCaption,2) End With End With |
680 |
How can I assign a picture or an icon to a bar in the chart
Dim h With Exg2antt1 .Images("gBJJgBAIDAAGAAEAAQhYAf8Pf4hh0QihCJo2AEZjQAjEZFEaIEaEEaAIAkcbk0olUrlktl0vmExmUzmk1m03nE5nU7nk9n0/oFBoVDolFo1HpFJpVLplNp1PqFRqVTq" & _ "lVq1XrFZrVbrldr1fsFhsVjslls1ntFptVrtltt1vuFxuVzul1u13vF5vV7vl9v1/wGBwWDwmFw2HxGJxWLxmNx0xiFdyOTh8Tf9ZymXx+QytcyNgz8r0OblWjyWds+m" & _ "0ka1Vf1ta1+r1mos2xrG2xeZ0+a0W0qOx3GO4NV3WeyvD2XJ5XL5nN51aiw+lfSj0gkUkAEllHanHI5j/cHg8EZf7w8vl8j4f/qfEZeB09/vjLAB30+kZQAP/P5/H6/y" & _ "NAOAEAwCjMBwFAEDwJBMDwLBYAP2/8Hv8/gAGAD8LQs9w/nhDY/oygIA=") .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCaption,"<img>1</img>") End With End With |
679 |
How can I display or add an anchor or a hyperlink in the link
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/1/2001#,#1/3/2001#,"K1") .AddItem("") .AddItem("") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkText,"just <a1>link</a>") End With End With |
678 |
How can I display a picture or an icon on the link
Dim h1,h2 With Exg2antt1 .Images("gBJJgBAIDAAGAAEAAQhYAf8Pf4hh0QihCJo2AEZjQAjEZFEaIEaEEaAIAkcbk0olUrlktl0vmExmUzmk1m03nE5nU7nk9n0/oFBoVDolFo1HpFJpVLplNp1PqFRqVTq" & _ "lVq1XrFZrVbrldr1fsFhsVjslls1ntFptVrtltt1vuFxuVzul1u13vF5vV7vl9v1/wGBwWDwmFw2HxGJxWLxmNx0xiFdyOTh8Tf9ZymXx+QytcyNgz8r0OblWjyWds+m" & _ "0ka1Vf1ta1+r1mos2xrG2xeZ0+a0W0qOx3GO4NV3WeyvD2XJ5XL5nN51aiw+lfSj0gkUkAEllHanHI5j/cHg8EZf7w8vl8j4f/qfEZeB09/vjLAB30+kZQAP/P5/H6/y" & _ "NAOAEAwCjMBwFAEDwJBMDwLBYAP2/8Hv8/gAGAD8LQs9w/nhDY/oygIA=") .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/1/2001#,#1/3/2001#,"K1") .AddItem("") .AddItem("") .AddItem("") .AddItem("") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkText,"just <img>1</img> link") End With End With |
677 |
How can I display a picture or an icon on the link
Dim h1,h2 With Exg2antt1 .set_HTMLPicture("pic1","c:\exontrol\images\zipdisk.gif") .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/1/2001#,#1/3/2001#,"K1") .AddItem("") .AddItem("") .AddItem("") .AddItem("") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkText,"<img>pic1</img><br><br>just a link") End With End With |
676 |
How can I display some HTML text or caption on link
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/1/2001#,#1/3/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkText,"L<b>1</b>") End With End With |
675 |
How can I assign a tooltip to a link
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/1/2001#,#1/3/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkText,"L<b>1</b>") .set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkToolTip,"This is a bit of text that's shown when the cursor hovers the link") End With End With |
674 |
Can I change the width or the size of the link
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkStyle,0) .set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkWidth,2) End With End With |
673 |
Can I change the style of the link
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkStyle,4) End With End With |
672 |
Can I change the color of the link
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkColor,255) End With End With |
671 |
Can I change the part of the bar where the link ends
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkStartPos,1) .set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkEndPos,1) End With End With |
670 |
Can I change the part of the bar where the link starts
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkStartPos,0) End With End With |
669 |
How can I associate an extra data to a link
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkUserData,"your data") End With End With |
668 |
How can I show or hide a specified link
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkEndBar,False) End With End With |
667 |
How can I get the key of the bar where the link end
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .AddItem(.get_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkEndBar)) End With End With |
666 |
How can I get the key of the bar where the link starts
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .AddItem(.get_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkStartBar)) End With End With |
665 |
How can I get the handle of the item where the link ends
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .AddItem(.get_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkEndItem)) End With End With |
664 |
How can I get the handle of the item where the link starts
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .AddItem(.get_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkStartItem)) End With End With |
663 |
How can I enumerate the links in the chart
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .AddLink("L2",h2,"K2",h1,"K1") .AddItem(.FirstLink) .AddItem(.get_NextLink(.FirstLink)) End With End With |
662 |
How can I access the properties and method of the link between two bars
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/1/2001#,#1/3/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .set_Link("L1",exontrol.EXG2ANTTLib.LinkPropertyEnum.exLinkText,"L<b>1</b>") End With End With |
661 |
How can I remove a link between two bars
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .ClearLinks() End With End With |
660 |
How can I remove a link between two bars
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") .RemoveLink("L1") End With End With |
659 |
How do I add a link between two bars
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .AddLink("L1",h1,"K1",h2,"K2") End With End With |
658 |
How do I ungroup the bars in the chart
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .GroupBars(h1,"K1",True,h2,"K2",True) .GroupBars(h1,"K1",False,h2,"K2",False) .UngroupBars(h1,"K1",h2,"K2") End With End With |
657 |
How do I group one or more bars in the chart, so they are moved together
Dim h1,h2 With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h1 = .AddItem("Task 1") .AddBar(h1,"Task",#1/2/2001#,#1/4/2001#,"K1") h2 = .AddItem("Task 2") .AddBar(h2,"Task",#1/5/2001#,#1/7/2001#,"K2") .GroupBars(h1,"K1",True,h2,"K2",True) .GroupBars(h1,"K1",False,h2,"K2",False) End With End With |
656 |
How do I find the number or count of bars in the item
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/1/2001#,#1/2/2001#,"K1") .AddBar(h,"Task",#1/4/2001#,#1/6/2001#,"K2") .set_ItemBar(h,"K2",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCaption,.get_ItemBar(h,"<*>",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarsCount)) End With End With |
655 |
How can I assign any extra data to a bar in the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarData,"your data") End With End With |
654 |
How can I enable or disable resizing the percent value of a progress bar, at runtime
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# .Chart.Bars.Add("Task%Progress").Shortcut = "Percent" With .Items h = .AddItem("Task 1") .AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.35) .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCanResizePercent,False) End With End With |
653 |
Is there any way to change the background color for percent value being displayed on the progress bar
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# .Chart.Bars.Add("Task%Progress").Shortcut = "Percent" With .Items h = .AddItem("Task 1") .AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.35) .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarShowPercentCaption,True) .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercentCaptionFormat,"<bgcolor=FF0000> %p%</bgcolor>") End With End With |
652 |
Is there any way to change the color for percent value being displayed on the progress bar
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# .Chart.Bars.Add("Task%Progress").Shortcut = "Percent" With .Items h = .AddItem("Task 1") .AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.35) .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarShowPercentCaption,True) .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercentCaptionFormat,"<fgcolor=FF0000>%p%</fgcolor>") End With End With |
651 |
Is there any way to change the font for percent value being displayed on the progress bar
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# .Chart.Bars.Add("Task%Progress").Shortcut = "Percent" With .Items h = .AddItem("Task 1") .AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.35) .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarShowPercentCaption,True) .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercentCaptionFormat,"<b><font Tahoma;12>%%p</font></b>") End With End With |
650 |
How can I horizontally align the caption / percent of a progress-bar
Dim h With Exg2antt1 .BeginUpdate() .Columns.Add("Task") With .Chart .LevelCount = 2 .set_PaneWidth(False,128) .FirstVisibleDate = #1/1/2001# With .Bars.Add("Task%Progress") .Shortcut = "Percent" .set_Def(exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarShowPercentCaption,True) .set_Def(exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,1) End With End With With .Items h = .AddItem("Left") .AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarAlignPercentCaption,0) h = .AddItem("Center") .AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarAlignPercentCaption,1) h = .AddItem("Right") .AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarAlignPercentCaption,2) h = .AddItem("Left") .AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarAlignPercentCaption,0) .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.5) h = .AddItem("Center") .AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.5) .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarAlignPercentCaption,1) h = .AddItem("Right") .AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarAlignPercentCaption,2) .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.5) End With .EndUpdate() End With |
649 |
Is there any way to change the format of the percent being displayed on the progress bar
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# .Chart.Bars.Add("Task%Progress").Shortcut = "Percent" With .Items h = .AddItem("Task 1") .AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.4) .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarShowPercentCaption,True) .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercentCaptionFormat,"<b>%p/100</b>") End With End With |
648 |
How can I show or hide the percent value in the progress bar
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# .Chart.Bars.Add("Task%Progress").Shortcut = "Percent" With .Items h = .AddItem("Task 1") .AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.4) .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarShowPercentCaption,True) End With End With |
647 |
How can I change the percent value in a progress bar
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# .Chart.Bars.Add("Task%Progress").Shortcut = "Percent" With .Items h = .AddItem("Task 1") .AddBar(h,"Percent",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.4) End With End With |
646 |
How can I add a percent bar
' BarResize event - Occurs when a bar is moved or resized. Private Sub Exg2antt1_BarResize(ByVal sender As System.Object,ByVal Item As Integer,ByVal Key As Object) Handles Exg2antt1.BarResize With Exg2antt1 Debug.Print( Key ) End With End Sub Dim h With Exg2antt1 .BeginUpdate() .Columns.Add("Task") With .Chart .LevelCount = 2 .FirstVisibleDate = #1/1/2001# .set_PaneWidth(False,64) With .Bars.Add("Task%Progress") .Shortcut = "P" .set_Def(exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarShowPercentCaption,True) End With End With With .Items h = .AddItem("Task 1") .AddBar(h,"P",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.4) h = .AddItem("Task 2") .AddBar(h,"Task%Progress",#1/2/2001#,#1/6/2001#,"K2") .set_ItemBar(h,"K2",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarPercent,0.15) End With .EndUpdate() End With |
645 |
How can I fix or lock a specified bar at runtime, in the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCanResize,False) .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCanMove,False) End With End With |
644 |
How can I enabled or disable moving a specified bar at runtime, in the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCanResize,False) .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCanMove,False) End With End With |
643 |
How can I enabled or disable sizing a specified bar at runtime, in the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCanResize,False) End With End With |
642 |
How can I change the key of the bar in the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarKey,"NewK") .set_ItemBar(h,"NewK",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCaption,.get_ItemBar(h,"NewK",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarKey)) End With End With |
641 |
Can I add a bar in the chart, using your EBN files
Dim h With Exg2antt1 .VisualAppearance.Add(1,"c:\exontrol\images\normal.ebn") .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"",#1/2/2001#,#1/5/2001#,"K1"," EBN ") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarBackColor,16777216) .AddBar(h,"Task",#1/6/2001#,#1/8/2001#,"K2") End With End With |
640 |
How can I change the background color of the bar in the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# .Chart.Bars.Copy("Task","TaskR").Color = Color.FromArgb(255,0,0) With .Items h = .AddItem("Task 1") .AddBar(h,"TaskR",#1/2/2001#,#1/6/2001#,"K1") End With End With |
639 |
How can I change the background color of the bar in the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# .Chart.ShowNonworkingDates = False With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarBackColor,8421504) End With End With |
638 |
How can I change the background color of the HTML text or caption of the bar in the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCaption,"<bgcolor=FF0000> to do </bgcolor>") End With End With |
637 |
How can I change the foreground color of the HTML text or caption of the bar in the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1","t<fgcolor=0000FF>o</fgcolor> do") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarForeColor,16777215) End With End With |
636 |
How can I change the foreground color of the HTML text or caption of the bar in the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCaption,"<bgcolor=FF0000> to do </bgcolor>") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarForeColor,16777215) End With End With |
635 |
How can I assign a tooltip to a bar in the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/4/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarToolTip,"This is a bit of text that's displayed when the cursor hovers the bar") End With End With |
634 |
How can I vertically align the HTML text or caption of the bar in the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .set_ItemHeight(h,32) .AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCaption,"<bgcolor=FF0000> to do </bgcolor>") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarVAlignCaption,0) End With End With |
633 |
How can I align the HTML text or caption of the bar in the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCaption,"<bgcolor=FF0000> to do </bgcolor>") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarHAlignCaption,0) End With End With |
632 |
How can I assign a text or some HTML caption to a bar in the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/6/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarCaption," <bgcolor=FF0000>to do</bgcolor> ") End With End With |
631 |
How can I change the ending date of the bar in the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/4/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarEnd,#1/6/2001#) End With End With |
630 |
How can I change the starting date of the bar in the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/4/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarStart,#1/1/2001#) End With End With |
629 |
How can I change the style or the name of the bar in the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/4/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarName,"Progress") End With End With |
628 |
How can I access properties and methods of the bar in the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/4/2001#,"K1") .set_ItemBar(h,"K1",exontrol.EXG2ANTTLib.ItemBarPropertyEnum.exBarName,"Progress") End With End With |
627 |
How can I remove all bars in the item
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/4/2001#,"K1") .ClearBars(h) End With End With |
626 |
How can I remove a bar from the chart
Dim h With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items h = .AddItem("Task 1") .AddBar(h,"Task",#1/2/2001#,#1/4/2001#,"K1") .RemoveBar(h,"K1") End With End With |
625 |
How can I add a bar and some text inside, in the chart area
With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar(.AddItem("Task 1"),"Task",#1/2/2001#,#1/6/2001#,Nothing," to do ") End With End With |
624 |
How can I add a bar and some text inside, in the chart area
With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar(.AddItem("Task 1"),"Task",#1/2/2001#,#1/6/2001#,Nothing,"<bgcolor=FF0000> to do </bgcolor>") End With End With |
623 |
How can I add an anchor or a hyperline in the chart area
With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar(.AddItem("Task 1"),"",#1/2/2001#,#1/14/2001#,Nothing,"just a <a1>link</a>") End With End With |
622 |
How can I add some text or captions in the chart area
With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar(.AddItem("Task 1"),"",#1/2/2001#,#1/14/2001#,Nothing,"just a <b>caption</b>") End With End With |
621 |
How can I add a bar in the chart area
With Exg2antt1 .Columns.Add("Task") .Chart.FirstVisibleDate = #1/1/2001# With .Items .AddBar(.AddItem("Task 1"),"Task",#1/2/2001#,#1/4/2001#) End With End With |
620 |
Is there any option to put a picture or an icon to the thumb part of the scroll bar
With Exg2antt1 .Images("gBJJgBAIDAAGAAEAAQhYAf8Pf4hh0QihCJo2AEZjQAjEZFEaIEaEEaAIAkcbk0olUrlktl0vmExmUzmk1m03nE5nU7nk9n0/oFBoVDolFo1HpFJpVLplNp1PqFRqVTq" & _ "lVq1XrFZrVbrldr1fsFhsVjslls1ntFptVrtltt1vuFxuVzul1u13vF5vV7vl9v1/wGBwWDwmFw2HxGJxWLxmNx0xiFdyOTh8Tf9ZymXx+QytcyNgz8r0OblWjyWds+m" & _ "0ka1Vf1ta1+r1mos2xrG2xeZ0+a0W0qOx3GO4NV3WeyvD2XJ5XL5nN51aiw+lfSj0gkUkAEllHanHI5j/cHg8EZf7w8vl8j4f/qfEZeB09/vjLAB30+kZQAP/P5/H6/y" & _ "NAOAEAwCjMBwFAEDwJBMDwLBYAP2/8Hv8/gAGAD8LQs9w/nhDY/oygIA=") .set_ScrollPartCaption(exontrol.EXG2ANTTLib.ScrollBarEnum.exHChartScroll,exontrol.EXG2ANTTLib.ScrollPartEnum.exThumbPart,"<img>1</img>") .set_ScrollThumbSize(exontrol.EXG2ANTTLib.ScrollBarEnum.exHChartScroll,24) End With |
619 |
How can I scroll fast the chart, or page by page
With Exg2antt1 .Images("gBJJgBAIDAAGAAEAAQhYAf8Pf4hh0QihCJo2AEZjQAjEZFEaIEaEEaAIAkcbk0olUrlktl0vmExmUzmk1m03nE5nU7nk9n0/oFBoVDolFo1HpFJpVLplNp1PqFRqVTq" & _ "lVq1XrFZrVbrldr1fsFhsVjslls1ntFptVrtltt1vuFxuVzul1u13vF5vV7vl9v1/wGBwWDwmFw2HxGJxWLxmNx0xiFdyOTh8Tf9ZymXx+QytcyNgz8r0OblWjyWds+m" & _ "0ka1Vf1ta1+r1mos2xrG2xeZ0+a0W0qOx3GO4NV3WeyvD2XJ5XL5nN51aiw+lfSj0gkUkAEllHanHI5j/cHg8EZf7w8vl8j4f/qfEZeB09/vjLAB30+kZQAP/P5/H6/y" & _ "NAOAEAwCjMBwFAEDwJBMDwLBYAP2/8Hv8/gAGAD8LQs9w/nhDY/oygIA=") .ScrollHeight = 20 .ScrollButtonWidth = 20 .AllowChartScrollPage = True .set_ScrollPartCaption(exontrol.EXG2ANTTLib.ScrollBarEnum.exHChartScroll,exontrol.EXG2ANTTLib.ScrollPartEnum.exLeftB5Part,"<img>1</img>") .set_ScrollPartCaption(exontrol.EXG2ANTTLib.ScrollBarEnum.exHChartScroll,exontrol.EXG2ANTTLib.ScrollPartEnum.exRightB1Part,"<img>2</img>") End With |
618 |
How can I scroll fast the chart, or page by page
With Exg2antt1 .ScrollButtonWidth = 16 .AllowChartScrollPage = True .set_ScrollPartCaption(exontrol.EXG2ANTTLib.ScrollBarEnum.exHChartScroll,exontrol.EXG2ANTTLib.ScrollPartEnum.exLeftB5Part,"<<") .set_ScrollPartCaption(exontrol.EXG2ANTTLib.ScrollBarEnum.exHChartScroll,exontrol.EXG2ANTTLib.ScrollPartEnum.exRightB1Part,">>") End With |
617 |
How can I scroll fast the chart, or page by page
With Exg2antt1 .AllowChartScrollPage = True End With |
616 |
How can I display years, from 3 to 3
With Exg2antt1 .Chart.UnitWidth = 64 With .Chart.get_Level(0) .Label = "<%yyyy%>" .Unit = exontrol.EXG2ANTTLib.UnitEnum.exYear .Count = 3 End With End With |
615 |
How can I display years
With Exg2antt1 .Chart.UnitWidth = 64 With .Chart.get_Level(0) .Label = "<%yy%>" .Unit = exontrol.EXG2ANTTLib.UnitEnum.exYear End With End With |
614 |
How can I display years
|
613 |
How can I display months, from 3 to 3
With Exg2antt1 .Chart.FirstVisibleDate = #1/1/2001# .Chart.LevelCount = 2 .Chart.UnitWidth = 64 .Chart.get_Level(0).Label = 1 With .Chart.get_Level(1) .Label = "<%mmmm%>" .Unit = exontrol.EXG2ANTTLib.UnitEnum.exMonth .Count = 3 End With End With |
612 |
How can I display months
With Exg2antt1 .Chart.UnitWidth = 64 .Chart.LevelCount = 2 .Chart.get_Level(0).Label = 1 With .Chart.get_Level(1) .Label = "<%mmmm%>/<%yy%>" .Unit = exontrol.EXG2ANTTLib.UnitEnum.exMonth End With End With |
611 |
How can I display months
With Exg2antt1 .Chart.LevelCount = 2 .Chart.UnitWidth = 64 .Chart.get_Level(0).Label = 1 .Chart.get_Level(1).Label = 16 End With |
610 |
How can I display weeks
With Exg2antt1 .Chart.LevelCount = 2 .Chart.UnitWidth = 64 .Chart.get_Level(0).Label = 17 .Chart.get_Level(1).Label = 256 End With |
609 |
How can I display weeks
With Exg2antt1 .Chart.LevelCount = 2 .Chart.get_Level(0).Label = 17 .Chart.get_Level(1).Label = "<%ww%>" End With |
608 |
How can I display days, from 2 to 2
With Exg2antt1 .Chart.LevelCount = 2 .Chart.get_Level(0).Label = 256 With .Chart.get_Level(1) .Label = "<%dd%>" .Count = 2 End With End With |
607 |
How can I display days
With Exg2antt1 .Chart.LevelCount = 2 .Chart.get_Level(0).Label = 256 .Chart.get_Level(1).Label = "<%dd%>" End With |
606 |
How can I display days
With Exg2antt1 .Chart.LevelCount = 2 .Chart.get_Level(0).Label = 256 .Chart.get_Level(1).Label = 4096 End With |
605 |
How can I display hours, from 6 to 6
With Exg2antt1 .Chart.FirstVisibleDate = "00:00" .Chart.LevelCount = 2 .Chart.get_Level(0).Label = 4096 With .Chart.get_Level(1) .Label = "<%hh%>" .Count = 6 End With End With |
604 |
How can I display hours
With Exg2antt1 .Chart.LevelCount = 2 .Chart.get_Level(0).Label = 4096 .Chart.get_Level(1).Label = "<%hh%>" End With |
603 |
How can I display hours
With Exg2antt1 .Chart.LevelCount = 2 .Chart.get_Level(0).Label = 4096 .Chart.get_Level(1).Label = 65536 End With |
602 |
How can I display minutes, from 15 to 15
With Exg2antt1 .Chart.FirstVisibleDate = "00:00" .Chart.LevelCount = 2 .Chart.get_Level(0).Label = 65536 With .Chart.get_Level(1) .Label = "<%nn%>" .Count = 15 End With End With |
601 |
How can I display minutes
With Exg2antt1 .Chart.LevelCount = 2 .Chart.get_Level(0).Label = 65536 .Chart.get_Level(1).Label = "<%nn%>" End With |